Ann Greenwood
Recep Bayraktar is the owner of Happy Homes Remodeling (HHR). We met him at a home expo show in the spring. We liked what he had to say and decided to ask him for a bid on our master bath remodel. He was not the lowest bidder, but he was by far the most attentive to what we wanted and asked all the proper questions in order to make an accurate bid. (No surprises later.) The lowest bidder was unable to recall what we wanted and did not put anything in writing as requested.
Recep and his helper Roberto came every day and made consistent and purposeful progress. Each day the entry, stairs, hallway, and bedroom were covered to protect the surface and to cut down on the dust. Each evening the coverings were removed and the work area was cleaned up. They worked very quietly and were unobtrusive to our daily routine.
Recep is a perfectionist! He verified every detail to be sure it was what we wanted and he artistically completed the work. He made sure all the tile layouts were the best for the appearance of the room and installed the tiles with precision.
We couldn't be happier with the outcome. As you can see from the pictures the results are spectacular
Recep and his helper Roberto came every day and made consistent and purposeful progress. Each day the entry, stairs, hallway, and bedroom were covered to protect the surface and to cut down on the dust. Each evening the coverings were removed and the work area was cleaned up. They worked very quietly and were unobtrusive to our daily routine.
Recep is a perfectionist! He verified every detail to be sure it was what we wanted and he artistically completed the work. He made sure all the tile layouts were the best for the appearance of the room and installed the tiles with precision.
We couldn't be happier with the outcome. As you can see from the pictures the results are spectacular
Description of work:
Demolished the old shower, tub, wall tile. Fabricated a new extended shower and constructed a new wall. Tiled wall, shower, tub mount, and floor. Installed new bubble tub, toilet, vanity lights, and plumbing fixtures and trim. Painted the walls and trim and replaced the quarter round.
Category:
Lighting, Remodeling - General, Remodeling - Kitchen & Bathroom
Services Performed:
Yes
Work Completed Date:
June 18, 2013
Hire Again:
Yes